Investments

The current portfolio is as follows:

ENERVENT, S.A.

Colladetes I and  Colladetes II Wind farms:

Installed capacity:

Number of wind turbines:

Beginning operations:

Participation:

Investment:

El Perelló (Tarragona)

35,64 MW

54 turbines Gamesa G47 666 KW

Year 1999

29%

July and December 2016

EÓLICA EL CONJURO, S.L.

El Conjuro Wind farm:

Installed capacity:

Number of wind turbines:

Beginning operations:

Participation:

Investment:

Motril and Gualchos (Granada)

13,6 MW

16 turbines Gamesa G58  850 KW

Year 2006

100%

December 2016

EÓLICA 2000, S.L.

Cañoneras Wind farm:

Installed capacity:

Number of wind turbines:

Beginning operations:

Participation:

Investment:

Soba (Cantabria)

32,3 MW

38 turbines Gamesa G58 850 KW

Year 2007 and 2010

22,2%

December 2017

LAS NAVARRICAS DE BORDÓN, S.L.

Cerro de la Atalaya Wind farm:

Installed capacity:

Number of wind turbines:

Beginning operations:

Participation:

Investment:

Cadrete (Zaragoza)

1,67 MW

1 turbine General Electric ECO 80 1.670 KW

Year 2008

89,5%

December 2017 and january 2018

CASTRÍOS S.A.

Wind farm Castríos:

Installed capacity:

Number of wind turbines:

Beginning operations:

Participation:

Investment:

Espinosa de los Monteros (Burgos)

26,4 MW

24

Year 2006

20%

November 2018

EÓLICA DE ZORRAQUIN, S.L.

Wind farm Zorraquín:

Installed capacity:

Number of wind turbines:

Beginning operations:

Participation:

Investment:

Villaciervos (Soria)

12 MW

6

Año 2009

34%

anuary 2019